PAKISTAN PETROLEUM (PPL)

Location:Sui-gas field (Balochistan) Well Capacity: 17.1x106 m3/day

  

  • Jobs is to design the detail engineering document and drawings of purification banks 12 and 13, dehydration units 5 and 6 (DCS-IV) currently running on single loop controllers to latest Honeywell's C300 controller. The project also includes to design a functional design specification to seamlessly integrate DCS-IV to their existing DCS-I II III