Power Generation Section - Combined Cycle Power Plant

The Project includes:

  • Installation and Commissioning of control system for HRSG and EBOP.
  • Commissioning of Boiler Protection System.
  • Addition of monitoring parameters from Steam Turbine Area
  • Automatic Startup of the HRSG
  • As Build Documentation development

  • Honeywell's Experion PKS control system on 2 x 28MW Gross (At ISO Conditions) Extension of NATURAL GAS FIRED COMBINED CYCLE POWER PLANT located at Korangi Creek Karachi. Project was completed in two phases First phase was completed in 2011 and the second phase was commissioned in 2015.


  • Efficiency rise in controlling condensate recirculation pump
  • Attemperator control allows desired steam temperature (e.g. 400 o C)
  • Feed water temperature and pressure are controlled and oxygen content is removed by control de-aerator
  • Automated two combine cycle power plants of K-Electric at Korangi Power Complex